EDGE COGNITIVE NODE CORE // ONLINE

PLUNGER
AI BRAIN

PHYSICS-INFORMED PREDICTIVE LIFT CONTROLLER

Close the loop on gas well automation. Install our local edge cockpit and completely eliminate timer guessing, gas locks, and valve damages.

The Cost of Guesswork

Why Traditional Controllers
Keep Gas Wells Trapped

Wells are dynamic, governed by changing reservoir physics. Static timers and basic rule-based controllers fail to adapt, costing operators millions in downtime.

Traditional Rules & Timers

Reactive & Fixed Timer Logic

  • Liquid Loading: Cannot react to sudden liquid dumps, letting the well load and die.
  • Mechanical Destruction: Plungers arrive at surface > 1,500 ft/min, cracking valves.
  • Constant Interventions: Production engineers make manual guessworks via daily site visits.

Plunger AI Brain

Predictive & Physics-Informed

  • Physics-Informed: Continuously estimates casing/tubing gradients to predict liquid levels.
  • Optimal Velocity (350–1200 ft/min): Dynamically scales shut-in periods to ensure safe arrival speeds.
  • Autonomous Adaptability: Runs edge cycles 24/7, boosting gas yields by 15-20 MCF per day.
Well Optimization Monitor

AUTONOMOUS STATUS: OPTIMAL

AI adjusting afterflow parameters in real-time. Target velocity locked.

OPTIMIZING
GAS PRODUCTION (MCF/D)
TIMELINE (24 HOUR CYCLES)
Arrival Consistency100.0%
Average Velocity680 ft/m
Uptime Delta99.99%
Interactive Physics Lab

Simulate Your Wellbore

Interact with the physics of a gas well. Adjust the pressure and fluid parameters below to see how Plunger AI maintains safe velocity ranges and optimal production.

Physics Controllers

Casing Pressure(Energy Source)480 PSI
100 PSI (Low)1,000 PSI (High energy)
Liquid Column(Flow Resistance)3.2 Bbls
0.5 Bbls (Dry well)15 Bbls (Severely flooded)
Sales Line Pressure(System Backpressure)110 PSI
50 PSI (Low backpressure)500 PSI (High pipeline pressure)

Calculated Diagnostics

Plunger Velocity650 ft/minTarget: 350 - 1200 ft/min
Gas Flow Yield15.2 MCF/dBased on cycle rate

Operation Status: OPTIMAL

Gas pressure is successfully overriding system resistance. Plunger is cycling smoothly in the optimal velocity range, maximizing unloading efficiency.

Cross-Section Wellbore Physics
Plunger Fluids (Liquid Column) Natural Gas Flow
Closed Loop Data Highway

Autonomous Pipeline Conduit

Witness how raw sensor physics flows into real-time model decision logic, producing automatic well adjustments on the fly.

INPUT STREAMING
100 Samples / Sec

1. Continuous Edge Sensing

Reads wellhead casing pressure, tubing pressure, and plunger arrival timestamps at the physical pad at a 100Hz frequency.

AI COGNITION ACTIVE
12ms Latency / Well

2. Physics-Informed Prediction

Edge processor runs neural net algorithms to forecast wellbore pressure buildup and liquid loading risks 30 cycles ahead.

SETPOINTS LOCKED
0.2s Action Dispatch

3. Closed-Loop Regulation

Automatically triggers changes to tubing-over-static, afterflow, and shut-in intervals, adjusting pneumatic valves.

Interactive Command Telemetry

The AI Edge Cockpit

Interact with the primary operational screens running directly on the edge hardware.

COCKPIT VER: 4.8.12
TELEMETRY SYNC: SECURE
MONITOR PORT: ASSET OVERVIEW
Asset Overview Cockpit Monitor
Edge Action Shell
Financial Impact Estimator

Calculate Your Production Lift

Input your current field statistics to calculate the revenue potential of deploying autonomous AI controllers across your asset.

Asset Parameters

Number of Wells25 wells
1 Well150 Wells
Avg. Well Production120 MCF/day
20 MCF/d (Stripper wells)500 MCF/d (High producers)
Natural Gas Spot Price$3.50 / MCF
$1.50 (Low Market)$8.00 (Peak Demand)
Standard AI Uplift Model:Estimations are modeled on a conservative 18% gas production uplift, which is the median value validated across our active installations.

Projected Incremental Returns

Estimated Volume Uplift+0 MCF / Day
Daily Revenue0
Monthly Revenue0
Yearly Revenue0
ESTIMATED PAYBACK PERIODIMMEDIATE ROI / PILOT GUARANTEE

Deploy on Your Assets Risk-Free

We run a no-upfront-cost pilot on 3 wells for 30 days to prove performance.

Schedule A Pilot
Field Endorsements

Trusted by Field Operations

From the control room to the well pad, production and engineering teams realize immediate volume increases and automated safety cycles.

Industry voice representation

VP OF UPSTREAM PRODUCTION - PERMIAN BASIN

VERIFIED CLIENT VOICE
"We deployed Plunger AI on 42 of our struggling wells in West Texas. Within 30 days, our average production grew by 18.5% daily. The autonomous controller reacts to line spikes faster than any field team could."
SYSTEM STATUS: VERIFIED
Industry voice representation

ASSET MANAGER - ANADARKO BASIN

VERIFIED CLIENT VOICE
"We were spending thousands weekly on swab rigs for liquid loaded wells. Since installing Plunger AI, plunger arrivals have hit 100% consistency, keeping the wells completely unloaded and flowing 24/7."
SYSTEM STATUS: VERIFIED
Industry voice representation

AUTOMATION SUPERINTENDENT - EAGLE FORD

VERIFIED CLIENT VOICE
"Traditional rules-based controllers require constant manual intervention as reservoir pressure decays. Plunger AI's edge neural networks adjust tubing-over-static targets dynamically. It's truly 'set and forget'."
SYSTEM STATUS: VERIFIED
Industry voice representation

PRODUCTION ENGINEER - BAKKEN FORMATION

VERIFIED CLIENT VOICE
"Valve and bumper damage used to be a major source of downtime. By keeping plunger velocities locked tightly in the 350-1200 ft/min target zone, Plunger AI has eliminated high-speed impact failures."
SYSTEM STATUS: VERIFIED
Industry voice representation

FIELD OPERATIONS LEAD - DJ BASIN

VERIFIED CLIENT VOICE
"Instead of reacting to low-velocity alarms and racing to site, we rely on the controller's auto-recovery cycle logic. The well restores itself automatically before liquid loading can kill the gas flow."
SYSTEM STATUS: VERIFIED
Industry voice representation

CHIEF DIGITAL OFFICER - MID-CONTINENT

VERIFIED CLIENT VOICE
"We've trialed multiple dashboard tools, but Plunger AI is the first platform that closes the loop and takes physical action at the edge. The production metrics and downtime reductions speak for themselves."
SYSTEM STATUS: VERIFIED
DEPLOYMENT PROTOCOL INITIALIZED

Ready to Connect
The AI Brain?

Stop relying on fixed, static timers. Hook up our cognitive edge controller and instantly maximize gas volumes while safeguarding your downhole equipment.

ZERO CAPEX SETUPDEPLOYS IN 24 HOURSRISK-FREE UPLIFT GUARANTEE